This building project has many challenges. I have done what I can to plan in advance and I constantly update my budget and timeline but I still get surprised either by things I hadn’t even considered or by the actual cost.

We joke about how much timber we have put into this house. Anyone would think I am developing a timber frame building…but alas, no. The old timber has either been eaten, has rotted from damp or has warped because it wasn’t installed properly the first time. New roof purlins and rafters, new ceiling and floor joists – all of it properly measured, cut and installed to Building Regs requirements. If I feel I need a walk in the woods I just pop into the building! All I am missing are the squirrels!

The external roof work started on 8 January and we have managed 5 days of active work in 2 weeks. That’s the problem of doing this in January. The weather plays a big part in how much progress can be made. The entire roof is receiving a new membrane and battens. We are retaining the tiles for one side of the roof, but installing new tiles for the other side. A bit of repointing around the chimneys and the addition of a new chimney pot should mean that the eventual new owners won’t have to touch the roof for 20 plus years.

On the rainy and/or windy days, we continue to work inside. Stud walls are going up and brickwork is being finalised. The power supply to the building has been moved and I have chosen a woodburner for the main lounge. This means the liner can be installed into the chimney whilst the scaffolding is in place.

The coming week looks good for cold sunshine so the roof should get some loving attention all week. My job…as always..is to keep the site tidy. My relationship with the wheelbarrow is steady.

I am not going onto the roof…that is one job too high for me. But I am slowly cleaning up the outside of the building in readiness for rendering and will be introduced to a high powered pressure washer this week.

Western Power have been in to move the mains electricity cable into the building. BT Openreach are popping by to remove some of their 1950’s wiring still attached to the building and I am having lengthy communication with the local authority about a street light positioned directly in line with 2 of the bedrooms. Watch this space!

Mr. Clooney (aka the caravan) has been treating me well. Cabin fever does strike occasionally. I have been pretty lucky so far. A few gales but no lightning yet. Lots of rain but no noticeable leaks and only one week of consistently freezing weather.

Have I spoken too soon…!

Fifteen and counting…

So there we have it. Fifteen weeks of gruelling effort and the property looks like a neglected squat. But to be fair I look similar!

But all is not as it seems. The big steel move last week proved successful and the property is still standing. Before I sleep at night I have that song going around in my head…you know the one about the bones but mine is about the property.

“The steel’s connected to the studwork.
The studwork’s connected to the wall plate
The wall plate’s connnected to the purlins…”

It lulls me to sleep. Surely this is what its like for every apprentice builder?

This week has seen the final wall demolished, even more floor joists installed along with chipboard flooring, and studwork built to shore up the leaning wall and start to define the rooms.

I have become a nogging champion! That is a real word – and no I have not missed an ‘s’ off the beginning! Those days are behind me !

All of this work means that apart from the roof, that the demolition stage has been completed – ish! A corner of the lounge, with curtains still intact, is as it was but this is more for security than necessity.

So what has been learnt and what is to come?

I have a load more words in my vocabulary and I know what they mean. I can’t wait for the challenges I will get playing Xmas scrabble with my family with all this new found knowledge.

I have muscles in my arms where before their girth was more aligned to comfort. Not suggesting the chicken wings have gone. Perhaps a little more like chicken thighs! I also have teeny, tiny little muscles in my fingers!

I was hoping this enormous effort would lead to weight loss but it seems there is nothing in this work (or any work for that matter) that assists my lack of personal willpower where chocolate bars are concerned. Pah!

I have three new body piercings. Not through choice but because I have occasionally, inadvertently, nailed myself to the property. This is a very real blood, sweat and tears effort.

The blood and sweat is obvious. Andy and Neil reassure me they will try better to control the tears when we re-start the project in 2020.

We are taking a Xmas break. Rob the roofer starts in January and then we start putting the property back together properly. The external render will be started. I am meeting the electrician and heating engineer during the first week of the new year to book them in for first fix. I have confirmed the underfloor heating and will be reviewing production of the stairs, windows and installation of the flue for the log-burner. The list of things not confirmed is still very long. Insulation, venting, kitchen, bathrooms, flooring, lighting, doors and more.

It will take as long as it takes…but my caravan dwelling days are going to be limited in 2020 – not least because I have to return it to its owners!

Merry Xmas to all That There Builder Girl blog followers. See you in 2020 !