My inner Little Miss Tidy has had a few moments this week as the work progresses. There is a continuous routine of make mess, clean up and repeat.

Things are moving along. Courtney has continued to install the plumbing and I have pipes of all sizes and shape everywhere! Steve popped back in to re-position a few more electrical cables and Jonathan the carpenter started fixing the door linings but then departed for the arrival of his first born. Lovely.

Neil and Andy have been creating a masterpiece with what was the Gents toilets in the old pub.

This room is to become the boiler room and store room. Internally its a relatively easy job to manage. Knock down one wall, insulate, batten, etc. Externally, the existing roof was an embarrassment to the tradesman that fitted it. No point in us leaving a crappy job (note the word links to the former use of the room. Ha!!) when everything else in the house is done to first class standards. So another batch of timber delivered, breather membrane, a little code 4 lead, batten, soffit and tiles, drainpipe and heyho – we have a working, waterproof, useable room.

Except…before we can finish it off we have to move a soil pipe, and wouldn’t you know – it is cracked and needs to be replaced. What the…? So the big guns have been out again as Andy has been digging more rubble out to access the pipe. Make mess, clean up. See what I mean.

In the meantime, we have been taking delivery of various materials required for the next stage. There has to be some thought process into where the materials are stored so that the minimal amount of handling is involved.

We took in 160 plus sheets (2400mmx1200mm) of plasterboard. The standard board weighs 23kg but the specialist board weighs 34kg and had to go upstairs – remembering of course I don’t yet have stairs. So it took 4 of us to pass the boards up. To say we were all muscle weary after moving it all is an understatement. This work starts next week.

In addition, we had hundreds of metres of insulation delivered. Rolls for the floors and attic, slab for the walls. I can just about carry a roll by myself but it’s a little comical to watch. I am just a little taller than a roll and I can only just get my arms around it. But at least I try!

It’s been a tough week for me personally. I have struggled with sleeping, washing, eating in the caravan after having a few months off and the luxury of a normal bed and flushing toilet! The budget – already pushed to the limit because of the roof – is again being tested daily as many of the prices for materials have increased.

I know I will get used to it again, but my energy levels dissipated as the week progressed. There are jobs for me to do but I didn’t really get on to them.

Am back home and I’ve had a word with myself. We probably have no more than 3 months to finish, and possibly less if we can get the materials. That time will fly – and at least we are busy and occupied – and healthy.

I will get back on it next week.

Enthused, energised and eager…

Author:

Not really a builder. Nor a girl in the youthful sense of the word. More a marketing woman. But needs must, and some effort has to go into sorting out this property. So a job change, a deep breath and off we go.

3 thoughts on “And the mess returns…

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s