It’s raining, it’s pouring…

Is it possible to grow webbed feet? Is Mr. Clooney the modern day ark? All answers on a postcard…

I can tell you it is a tad uncomfortable in South Somerset when the wind and rain announces itself. The days are disrupted as we are trying to finish the roof. The nights are difficult as Mr. Clooney rocks to the incessant beat of the downpour. Sleepeth interruptus occurred consistently last week. The only good point – at least I wasn’t there this weekend!

I guess that’s what you get for doing a renovation project in February. Ah well.

If anyone is thinking of doing property renovation I would still recommend it. It’s pretty interesting and certainly keeps me occupied. But I would issue a word of caution. Turning a commercial property into a residential property is so much more demanding.

Demanding = bigger budget.

The requirements are quite significant and only relevant because it was a commercial building. If this had been an old decrepid house that I was updating I wouldn’t have to do half the amount of work. About 1/3 of my total budget has been spent so far and much of it to comply with these commercial to residential regulations.

The bad weather has allowed us to move ahead inside. We have built the stud walls for the utility, both ensuite bathrooms and finished off a little brickwork here and there. The 4 new windows have been installed, but we are holding back on the new glazing for the existing windows (building regs) until I no longer need to use a hammer. Sensible precaution given my apprentice status and how many mis-hits I apply in a day.

We have also broken through the back wall which will eventually be the boiler room. At the moment its our toilet so its going to be ‘whistle while you pee’ as we no longer have a lockable door there.

So what next. We need 2 days clear weather to finish the roof and 5 days in the next 10 to do the rendering. In the meantime, we are inside insulating and it’s a big and expensive job. The sloped bedroom ceilings need 50mm between the rafters, then 60mm on top of that followed by battens and plasterboard. All of the outside walls get 60mm, then battens then plasterboard. The attic has 150mm between the joists and another 150mm on top. The bedroom floors get 100mm and each stud wall gets 75mm. The ground floor gets 100mm before the screed goes down.

I keep telling myself we are turning the corner. But it’s a long sloping, winding, uphill corner littered with hurdles and water features.

I am off to buy a snorkel and water wings…!

Author:

Not really a builder. Nor a girl in the youthful sense of the word. More a marketing woman. But needs must, and some effort has to go into sorting out this property. So a job change, a deep breath and off we go.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s